Project

  • Client: JOENY HOLDINGS LIMITED
  • Location:Port Harcourt, Nigeria
  • Date: October 01, 2022
  • Catetory: Business, Industrial
  • Time: 2 Month
  • Tags: Industry, Business

PROVISION OF COMPRESSOR & POSITIVE DISPLACEMENT PUMP AT EA STOG OPERATIONS

Provision of compressor & positive displacement pump at ea stog operations

Building constring support lay spread out on the table samsa was a travelling salesman and above it there hung a picture that he had recently cut out of an illustrated magazine and housed in a nice, gilded frame. It showed a lady fitted out with a fur hat and fur boa who sat upright, raising a heavy fur muff that covered the whole

Building constring support lay spread out on the table samsa was a travelling salesman and above it there hung a picture that he had recently cut out of an illustrated magazine and housed in a nice, gilded frame. It showed a lady fitted out with a fur hat and fur boa who sat upright, raising a heavy fur muff that covered the whole